China factory offered 8 Ton Natural Gas Fire Tube Boiler with ASME

2021-10-20

 Recently, a user has inquired about two gas fire boilers with the following specifications:

- Transportation up to Tripoli Port.

- Training

- Commissioning.

1. INTRODUCTION

Design, supply, install, training, commissioning and start-up of two identical complete firetube steam boilers with (associated equipment). Natural gas / F.O firing burners, theboiler shall be design to achieve reliable and highly efficient operational performancebeing strongly and simply built to comply with our technical requirements, the boilersshall be appropriate to employment in out-door.

2. ENVIRONMENTAL PARAMETERS :

The bidder shall take into consideration of the data given below during the finaldesign:

1 Mean maximum sun temperature (black bulb) 70°C
2  Mean maximum Ambient temperature  40°C
3  Mean minimum Ambient temperature  4°C
4  Mean maximum relative humidity  72%
5  Mean minimum relative humidity  53%
6  Basic Wind Speed (m/s)  3 to 10
7  Mean sea water temperature  20°C

3. SCOPE OF SUPPLY

Supply of complete package of two identical fire tube boilers skid mountedfully automatic, medium pressure approximately 15 kg/cm3, Capacity 7825 kg/h.The boilers included but not limit to the following associated equipment:Complete desecrators with its accessories such as feed pump, fittings...etc.Chemical feed units.boiler feed water pumps.boiler blow down drums.Other equipment when required.

8-ton-natural-gas-fire-tube-boiler-with-asme

8 Ton Natural Gas Fire Tube Boiler with ASME

4. PERFORMANCE GUARANTEE

Design conditions: the guarantee dates shall be based on the following

Boiler load:100%

Ambient temperature :25°C

Gross steam production:7825 kg/h

Feed water temperature: 105 °C

LHV of Natural Gaz:11700 kcal / Kg

Boiler Efficiency:85%

5. Guarantees :

As guarantees is based on a clean boiler commissioning and tested after erection, theboiler condition shall be inspected (internally & externally) before start performance Test.

5.1 Boilers shall be subjected to an ASME certified hydrostatic test, the pressure vessel shallComply with the standards of the ASME.

5.2 The main fuel light off burners manufacturing shall subject to a preliminary factory Test toensure proper operation of the combustion protect control.

5.3 Burners, fuel light off burners manufacturing and controls shall be subjected to a preliminaryfactory tests, to ensure proper Operation of the consumption protection control andsafeguard control and ignition.

5.4 During the stage of design, detailed engineering and construct of new boilers, NebrassEngineers (4) persons, shall visit contractor 's works aboard for period of 10 days, toEnsure the progress and quality of works. contractor shall arrange to provide access ofNebrass 's to all area of works, provide to perform testing of material, and other related tothe Verifying of applicable standards of construction. Cost of such tests shall be deemedinclude in the total contract price, but such inspection & tests shall not relieve the contractorlater from his duties and responsibilities towards the completion of the works, owner shallbear the Expenses of air price, food, accommodation etc.

6. Training:

6.1- Contractor shall provide training to Nebrass personal at contract 's yard aboardincluded supply of training materials to ( 6 ) person for a period of two weeksregarding the operation And maintenance of boilers and its accessories ,Nebrassshall be responsible for the expense of airfare, food, accommodation.

6.2- Contractor shall provide local training at the site, to (10) persons regarding operationand Maintenance, of new boilers and associated equipment.

7. Commissioning and handling over:

7.1- After completion of items mentioned above, commission andtest run shall carry out in the presence of Nebrass engineers,including supply of necessary spare parts which required forcommissioning and test run. test certificate of performance byagreed method Shall submitted to ARC.

7.2 After completion and commission of the boiler, contractor shallclean all areas of the work Place, hand over the facilities to theentire satisfaction of the owner.

7.3 Contractor shall submit to the owner, as the contrac.t completesets of ( as built ) final drawings Equipment data sheets,operation and maintenance manuals, etc. in an electronic filesAs well as a hard copy for the boilers and other accessoriesrelated to project.

7.4 Contractor shall provide operation &application software and itsmanuals for PLC system and any other system related tooperation and control of the project.

8. SPARE PARTS :

Supply spare parts for two years operation and maintenance of newboilers and its Associated equipment, included all mechanical, electricaland instrument parts etc.contractor shall submit to the owner his approval an item-priced list ofthe spare parts priorto supply them, this list should include in bidder'soffer.

9. Miscellaneous :

Any other items, which are not included here above but may benecessary and make the boilers functionally and successful foroperation and performance of the new boilers (Bidders to specify andquote such items in the bid).

China factory offered 8 Ton Natural Gas Fire Tube Boiler with ASME

4 ton gas fired steam boiler manufacturer

2026-08-12

XHJ is an national fixed-point of the first level of provinces of boiler,pressure vessel manufacture enterprise and one of the the biggest and the earliest of fuel and gas boiler manufacture enterprise in China. The company take the manufacture of boiler,pressure vessel as the foundation, established of the industrial system in product development

Horizontal 3 Pass Wet Back Boiler Factory

2026-07-31

XHJ boiler is very popular in global boiler market, many factory choose our boiler for stable performance. WNS series boiler is well known as a horizontal style three pass wet back boiler.This type boiler used widely in industries and can be designed as steam boiler or hot water boiler according customer inquiry.

How to Calculate Gas Boiler Burners Fuel Consumption?

2026-07-30

If you use gas boiler for heating, choosing good quality burner is very important. XHJ boiler always focus on high efficiency burner production, help user save more gas cost in daily use. Gas boiler burners consume fuel based on their BTU output. Natural and propane gas have specific levels of energy contained within them. One cubic-foot of natural gas contains 1075 BTUs of energy

2TPH gas fired ASME certified boiler factory

2026-07-24

XHJ Boiler Company,boiler manufacturer with A class license and ASME certification in china.So we can supply 2TPH gas fired ASME certified boiler include:single drum WNS series 2TPH gas fired ASME certified boiler and double drum SZS series 2TPH gas fired ASME certified boiler.

How to Select Natural Gas Boiler

2026-07-23

Natural gas boilers are widely used in industries such as food processing, chemicals, pharmaceuticals, hospitals, hotels, and district heating. Choosing the right boiler model not only affects production efficiency but also directly impacts investment costs and operating expenses.

Item-by-item quotation for the complete set of equipment for the coal mine's 4-ton gas hot water bo

2025-11-02

Coal mines are mainly coal-producing mines. There is no shortage of coal in every coal mining area, so most coal mines use coal-fired boilers. However, becau

The quotation of 10 tons oil and gas steam boiler includes installation fee

2025-10-30

WNS10-1.25-Y and Q are 10-ton oil-fired gas-fired steam boilers with a pressure of 1.25MPa. This boiler adopts the current popular horizontal internal combus

Operating costs and quotations of gas steam boilers for soy sauce production

2025-10-23

Soy sauce is a traditional Chinese condiment, which evolved from soy sauce. As early as more than 3,000 years ago, there was a record of making soy sauce in

14000kw gas hot water boiler, asme certified

2025-10-12

Recently, a customer called to inquire about a 14,000kw gas hot water boiler, which requires ASME certification and is exported to Spain. The 14000kw gas hot

20 tons of fuel gas boiler PLC control cabinet configuration list

2025-10-07

20 tons of fuel gas boiler PLC control cabinet configuration list serial number category Device name Sp

Get An Instant Quotation

For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.


  • Heat Converters
  • Pressure Converters
  • Temperature Converters

Any question, please contact us for free. Phone number: +86-371-86167233 Whatsapp: +86 177 19888549 Email:[email protected]

KW
bar
    °C