Supply, Installation, Erection, Testing and Commissioning of 18 MT/hr Natural Gas Fired Water Tube P
1.0 Technical Specification :
1.1 Natural Gas Fired Water Tube Packaged Auto Controlled Boiler (18 MT/hr.) :
01 (one) Set complete.
| 1.1.01 |
Water Tube Boiler |
|
|
| |
- Model |
: |
To be Specified by bidder |
| |
- Capacity |
: |
18000 Kg/hr or Nearest standard capacity |
| |
-Max working pressure |
: |
13 Kg/cm2 |
| |
-Normal Operating Pressure |
: |
10 Kg/cm2 |
| |
Operating Steam Temperature |
: |
2070 C |
| |
-Testing Water Pressure |
: |
19.5 Kg/cm2 |
| |
Thermal Efficiency |
: |
92% (min.) |
| |
-Feed Water Temperature |
: |
1040C |
| |
-Material of Drum |
: |
SA 516 Gr 70 or equivalent |
| |
-Material of Water Tube |
: |
SA 192 or equivalent |
| |
-Fin Welding : Automatic welding. No Manual welding Allowed |
| |
- Valves : Main Steam Valve, safety Valve, Feed Water Valve, Drain Valve, Pressure reducing Valve. Accessories : Pressure Gauge, Water Level Gauge. Pressure Limit S/W Pressure Controller, Air Flow meter, Flow meter with Totalizer for Steam, Water and Gas. Stipulation of Manufacturing : Manufactured according to ASME code and Quality Management system ISO-9001. |
| 1.1.02 |
Economizer |
|
: 01 (one) Set. |
| |
Type |
: |
Fin tube |
| |
Outlet gas temp. |
: |
As per design |
| |
Material, Tube |
: |
SA 269 –TP 316L or equivalent. |
| |
Fin |
: |
SA 240-TP 316L or equivalent. |
| |
|
|
|
| 1.1.03 |
Gas Burner |
|
|
| |
Type |
: |
Blast (Low Nox Type) |
| |
Max. Capacity |
: |
As per design |
| |
Control Type |
: |
Proportional Control, Linkage type |
| |
Fuel |
: |
N.G |
| |
Power |
: |
380V, 3ph & 50 Hz. |
| |
Inlet Gas Press. |
: |
2000 mm Aq-9000 mmAq |
| |
Nox |
: |
<50 ppm. |
| 1.1.04 |
Forced Draft Fan |
: |
01(One) Set. |
|
| |
Type |
: |
Turbo |
|
| |
Capacity |
: |
As per design |
|
| |
Pressure |
: |
As per design |
|
| |
Power |
: |
380V, 50 Hz, 3 phase |
|
| |
Motor |
: |
High Efficiency Motor. |
|
| |
|
|
|
|
| 1.1.05 |
Air Duct : |
: |
01(One) Set. |
|
| |
Scope |
: |
FD Fan to Burner |
|
| |
Material SA 131 Gr. × 3.2 mm1 or equivalent |
|
| |
|
|
| 1.1.06 |
Feed Water Pump : |
: |
02 (Two) Set |
|
| |
Model |
: |
To be mentioned |
|
| |
Flow |
: |
25 M3/hr. |
|
| |
Pressure. |
: |
15 Kg/cm2 (min m) |
|
| |
Motor Capacity |
: |
To be mentioned. |
|
| |
Brand |
: |
To be Specified by bidder. |
|
| |
Control and protection |
: |
To be provided. |
|
| |
|
|
|
|
| 1.1.07 |
Relief Valve |
: |
01 Set |
|
| |
Type |
: |
To be mentioned by bidder |
|
| |
|
|
|
|
| 1.1.08 |
Body Piping |
|
|
|
| |
Scope for work |
|
|
|
| |
Feed water pump piping (By pass piping) |
|
| |
Feed water control valve piping (By pass piping) |
|
| |
Valve material |
: |
Forged Carbon Steel or Equivalent. |
| |
Welding |
: |
TIG |
|
| |
|
|
|
|
| 1.1.09 |
Self monitoring low-high level alarm system : 01 (One) Set |
| |
Type |
: |
self monitoring electrode system |
|
| |
|
|
|
|
| 1.1.10 |
Chemical Dosing Pump : 02 (Two) Set |
|
| |
Metering Pump |
: |
To be specified by the bidder |
|
| |
Chemical Tank Material : PE |
|
| |
|
|
| 1.1.11 |
Control Panel : |
|
01 (One) Lot |
|
| |
|
|
|
|
| 1.1.12 |
Deaerator : |
|
01 Set |
|
| |
Type |
: |
To be mentioned by the bidder |
|
| |
Capacity |
: |
To be mentioned by the bidder |
|
| 1.1.13 |
Safety Systems: |
: |
To be mentioned by the bidder |
|
| 1.1.14 |
Above Boiler Specification may be relaxed for world renowned Boiler manufacturer |
| 1.1.15 |
Above Specification are not Limited. |
|
2. Documents to be submitted at the time of delivery of goods:
| 2.1 |
Cross sectional construction Drawing with scale |
: 3(three) Copy |
| 2.2 |
Calculation of heating surface |
: 3(three) Copy |
| 2.3 |
Calculation of strength of pressure parts |
: 3 Copy |
| 2.4 |
Inspection Authority’s Certificate of Inspection during Construction |
: 1(one) Copy |
| 2.5 |
Contractor’s Certificate of manufacturing and Test |
: 1(one) Copy |
| 2.6 |
Steel Maker’s test result certificate of Manufacturing. |
: 1(one) Copy |
| 2.7 |
Steam Pipe certificate for pipes over 3” I/D |
: 1(one) Copy |
| 2.8 |
Maker’s Stamp |
: 1(one) Copy |
| 9.9 |
Operation and Maintenance Manual |
: 3 (three) Copy |
Supply, Installation, Erection, 18 MT/hr, Natural Gas Fired Boiler, Water Tube Boiler
Get An Instant Quotation
For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.